CompTIA Project+ Practice Test (PK0-005)
Use the form below to configure your CompTIA Project+ Practice Test (PK0-005). The practice test can be configured to only include certain exam objectives and domains. You can choose between 5-100 questions and set a time limit.

CompTIA Project+ PK0-005 (V5) Information
The CompTIA Project+ certification is a globally recognized credential designed for professionals who manage small to medium-sized projects. Unlike more specialized project management certifications, Project+ provides a broad foundation, making it an ideal starting point for individuals who are new to project management or who manage projects alongside other job responsibilities. It covers essential concepts such as project life cycles, roles and responsibilities, communication strategies, and risk management. Because it does not require extensive prior experience or prerequisites, it is often seen as a practical alternative to more complex certifications like the PMP, offering a straightforward way for professionals to validate their project management knowledge.
One of the key advantages of CompTIA Project+ is its flexibility across industries. While many project management certifications are heavily focused on IT, Project+ applies to a wide range of business environments, including healthcare, finance, and manufacturing. This makes it especially useful for professionals who may not be strictly in the IT field but still need to understand and manage projects effectively. Employers value Project+ because it demonstrates a candidate’s ability to lead projects, manage resources, and ensure that deliverables meet business objectives. Additionally, it helps bridge the gap between technical teams and stakeholders, fostering better communication and coordination throughout a project's life cycle.
For those looking to advance their careers, CompTIA Project+ serves as a valuable stepping stone to more advanced project management certifications. It provides a solid understanding of fundamental project management principles, which can be built upon with further training and experience. Many professionals who earn Project+ go on to pursue certifications like PMP or PRINCE2, leveraging their foundational knowledge to handle more complex projects. Furthermore, because CompTIA certifications are vendor-neutral, Project+ holders are not tied to any specific project management methodology, giving them the flexibility to adapt to different organizational needs. With a growing emphasis on project-based work across industries, earning Project+ can provide professionals with a competitive edge in the job market.

Free CompTIA Project+ PK0-005 (V5) Practice Test
- 20 Questions
- Unlimited
- Project Management ConceptsProject Life Cycle PhasesTools and DocumentationBasics of IT and Governance
Free Preview
This test is a free preview, no account required.
Subscribe to unlock all content, keep track of your scores, and access AI features!
A project manager needs to determine the sequence of activities and identify task dependencies to calculate the critical path of the project. Which of the following tools would BEST help achieve this goal?
Gantt chart
Milestone chart
Budget burndown chart
Project network diagram
Answer Description
A project network diagram is the best tool for visualizing task sequences and dependencies, allowing the project manager to identify the critical path. Gantt charts display tasks over time but are less effective for showing detailed dependencies. Budget burndown charts focus on budget usage over time, and milestone charts highlight significant project events without detailing task dependencies.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is a critical path in project management?
How is a project network diagram different from a Gantt chart?
What are task dependencies in a project?
A project manager is overseeing a project that involves deploying wireless networking equipment in multiple facilities. To ensure compliance with local regulations, which of the following should the project manager prioritize?
Verify equipment complies with regional radio frequency regulations.
Ensure equipment is purchased from preferred vendors.
Select equipment based on cost savings.
Rely on the network engineers to handle any compliance issues.
Answer Description
The project manager should verify that the equipment complies with regional radio frequency regulations. Different countries and regions have specific regulations governing the use of radio frequencies and wireless equipment. Ensuring compliance avoids legal issues and potential interference with other devices. Focusing solely on preferred vendors or cost savings may overlook compliance requirements. Relying on network engineers without oversight can lead to unintentional non-compliance.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
Why do radio frequency regulations vary by region?
What are the consequences of using non-compliant wireless equipment?
How can project managers ensure compliance with regional radio frequency regulations?
What is the primary purpose of developing a business case during the discovery/concept preparation phase of a project?
To track the day-to-day execution of tasks against the project plan.
To create a detailed project schedule and work breakdown structure (WBS).
To formally close out vendor contracts and release project resources.
To justify the project's initiation by evaluating its benefits, costs, and risks.
Answer Description
The correct answer is that a business case is used to justify the project's initiation. A business case is a formal document that evaluates the potential benefits, costs, and risks of a proposed project. Its main purpose is to provide decision-makers with the necessary information to determine if the project is a worthwhile investment and should be initiated. The other options describe activities that occur in later phases of the project life cycle: creating a detailed schedule happens during planning, tracking daily tasks occurs during execution, and closing contracts is part of the closing phase.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is the discovery/concept preparation phase of a project?
What key components are included in a business case?
Why is it important to evaluate risks in the business case?
A project manager needs to determine the necessary steps to transition from the organization's existing operations to the improved operations envisioned by the project. Which of the following should the project manager perform to identify the required changes?
Develop a project charter
Perform a needs assessment
Create a stakeholder register
Conduct a gap analysis
Answer Description
Conducting a gap analysis helps the project manager identify the differences between the current state and the desired future state. This analysis highlights the gaps that need to be addressed to achieve the project goals. While a needs assessment gathers information about stakeholder requirements, it does not specifically focus on comparing current and future states. Developing a project charter establishes the project's objectives and scope but doesn't detail the steps needed for transition. Creating a stakeholder register documents stakeholders but doesn't aid in identifying required changes.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is a gap analysis?
How is a needs assessment different from a gap analysis?
Why wouldn't a project charter or stakeholder register help identify required changes?
A project manager needs to create a visual representation of the project schedule. The tool must display the start and end dates for all tasks, show the duration of each task as a horizontal bar, and illustrate the dependencies between tasks. Which of the following is the BEST tool for this purpose?
Fishbone diagram
Gantt chart
Budget burndown chart
Risk register
Answer Description
The correct answer is a Gantt chart. A Gantt chart is a bar chart that is specifically designed to illustrate a project schedule. It visually displays project tasks against a timeline, showing start and finish dates, durations, and dependencies between tasks. A risk register is used to track risks, a fishbone diagram is used for root cause analysis, and a budget burndown chart tracks spending against the budget, not the schedule's tasks and dependencies.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What are task dependencies in a Gantt chart?
What is the critical path in a Gantt chart?
How can software tools help in creating Gantt charts?
Which chart is used to display key deliverables or events in a project timeline without detailing task durations?
Milestone chart
Fishbone diagram
Gantt chart
Project network diagram
Answer Description
A milestone chart is used to display key deliverables or events in a project timeline without detailing task durations. It highlights significant points in the project, helping stakeholders understand important dates and objectives. In contrast, a Gantt chart shows task durations and sequencing, a fishbone diagram identifies root causes of problems, and a project network diagram illustrates task dependencies.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is the purpose of a Milestone Chart in project management?
How does a Milestone Chart differ from a Gantt Chart?
Why might a project manager use a Milestone Chart instead of other charts?
A project manager is leading a critical project that is experiencing significant issues. What approach should the project manager take to maintain the company's brand value?
Manage project setbacks discretely to minimize impact.
Communicate project progress regularly to stakeholders.
Align project outcomes with budget and schedule objectives.
Prioritize project timeline without sacrificing quality.
Answer Description
Communicating project progress regularly to stakeholders helps maintain transparency and trust, which are essential for preserving the company's brand value. Open communication keeps stakeholders informed about challenges and demonstrates the company's commitment to addressing issues responsibly.
Managing project setbacks discretely might seem beneficial, but it can lead to a lack of transparency, harming trust if stakeholders discover issues independently. Prioritizing the project timeline without sacrificing quality is important, but without effective communication, stakeholders may remain unaware of the efforts made, potentially affecting their perception. Aligning project outcomes with budget and schedule objectives focuses on internal metrics and may not directly address stakeholder concerns related to the challenges faced.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
Why is transparency important in project management?
What are some effective ways to communicate project progress to stakeholders?
How can communication impact the company's brand during project setbacks?
A project manager is leading the development of a new software product. During a planning meeting, a stakeholder raises a concern that the proposed marketing strategy might conflict with the company's established, family-friendly brand image. What is the project manager's MOST appropriate response to this concern?
Continue with the project as planned, assuming that senior management is solely responsible for brand strategy.
Inform the stakeholder that brand image is outside the scope of the software development project.
Acknowledge the concern and facilitate a discussion to align the project's marketing with company brand values.
Delegate all responsibility for brand alignment to the marketing department and proceed with the technical tasks.
Answer Description
A project manager is responsible for considering the project's impact on the company's brand value, which is an element of environmental, social, and governance (ESG) factors. When a potential conflict with brand image is raised, the project manager should address it directly by facilitating a discussion to ensure the project aligns with corporate values and reputation. Ignoring the concern, delegating it entirely without oversight, or assuming it's not a project-level responsibility are all incorrect actions that could harm the company's brand.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What role does a project manager play in addressing brand alignment?
What are ESG factors, and why are they relevant to project management?
How can project managers facilitate effective discussions with stakeholders about conflicts?
A company must choose between two projects. Project Alpha will cost $200,000 and is expected to generate $300,000 in revenue. Project Beta will cost $150,000 and is expected to generate $250,000 in revenue. Which project provides a higher percentage return on the initial investment?
Cannot determine from the information given
Project Alpha provides a higher percentage return
Both projects have the same percentage return
Project Beta provides a higher percentage return
Answer Description
To determine which project provides a higher percentage return, we calculate the Return on Investment (ROI) for each project. ROI is calculated as
ROI = [(Gain from Investment - Cost of Investment) Ă· Cost of Investment] Ă— 100%
For Project Alpha: ROI = [($300,000 - $200,000) Ă· $200,000] Ă— 100% = 50%
For Project Beta: ROI = [($250,000 - $150,000) Ă· $150,000] Ă— 100% = 66.7%
Therefore, Project Beta provides a higher percentage return on the initial investment. While both projects yield a net gain of $100,000, Project Beta offers a greater return relative to its cost.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
How is ROI calculated, and why do we use it?
What factors influence ROI besides cost and revenue?
Why does Project Beta have a higher percentage ROI despite both projects having the same net gain?
A project team is having difficulty understanding the sequence of activities and their durations within a project. The project manager decides to provide a visual representation that shows tasks over time, including their start and end dates and how they overlap. Which of the following tools should the project manager use to assist the team?
Risk report
Issue log
Gantt chart
Fishbone diagram
Answer Description
A Gantt chart is a visual scheduling tool that displays tasks along a timeline, showing their start and end dates, durations, and any overlaps or dependencies. This helps team members understand the sequence of activities and how they fit within the project's timeline. An issue log tracks problems that arise during the project but doesn't visualize scheduling information. A risk report summarizes potential risks and their impact but doesn't detail task sequences or durations. A fishbone diagram, also known as an Ishikawa diagram, is used for root cause analysis and doesn't represent scheduling data.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is a Gantt chart used for in project management?
What are the key differences between a Gantt chart and a fishbone diagram?
How do task dependencies work in a Gantt chart?
A project manager is developing a business case for a new data center. The initial budget includes costs for purchasing servers, networking hardware, and cooling systems. These are long-term assets that the company will own. How should the project manager categorize these one-time, upfront costs?
Capital Expenses
Administrative Expenses
Operational Expenses
Variable Expenses
Answer Description
Capital Expenses (CapEx) are funds used to acquire or upgrade physical assets like equipment, buildings, or property that will benefit the project over the long term. These are significant investments considered during the discovery phase to assess project feasibility. Operational Expenses (OpEx), in contrast, are the ongoing costs required for the day-to-day functioning of a business, such as salaries and utilities, and are not related to asset acquisition.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is the difference between CapEx and OpEx?
Why are CapEx considerations important during the discovery phase?
How is CapEx recorded differently from OpEx in accounting?
While executing a software rollout project, the team encounters unexpected server outages and a critical vendor shipment delay. The project manager needs a single document to log each problem, assign an owner, set a due date, and track resolution status throughout the lifecycle. Which project management document should the manager update?
Change log
Project dashboard
Risk register
Issue log
Answer Description
An issue log is the correct artifact for recording problems that have already occurred on a project. It captures details such as description, owner, priority, target resolution date, and status, enabling the team to monitor each issue until closure. A risk register lists potential events that could happen in the future, not problems that already exist. A change log documents approved alterations to the project's scope, schedule, or budget. A project dashboard summarizes high-level performance metrics but is not used to track individual problems.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What specific information is included in an issue log?
How is an issue log different from a risk register?
Who is responsible for maintaining and updating the issue log?
A project manager is planning a project with tasks that have uncertain durations. The manager wants to use a tool that allows for estimating task durations based on weighted averages of different time estimates to better plan the project schedule. Which project management tool should the manager use?
Critical Path Method diagram
PERT chart
Milestone chart
Gantt chart
Answer Description
The PERT chart is designed for projects where task durations are uncertain and allows for estimating task durations using weighted averages of different time estimates. This helps in accounting for variability and uncertainty in project scheduling. Gantt charts display tasks against a timeline but do not inherently accommodate variability in task durations. Milestone charts highlight key events in the project but do not provide detailed scheduling information. Critical Path Method diagrams focus on the sequence of critical tasks but typically use fixed time estimates without considering variability.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
How does a PERT chart calculate task durations using weighted averages?
What are the key differences between a PERT chart and a Critical Path Method diagram?
Why isn't a Gantt chart ideal for projects with uncertain task durations?
A project manager wants to engage suppliers who have been evaluated and approved before the project begins to ensure they meet specific criteria. What type of suppliers are these?
Prequalified vendors
Certified vendors
Single-source vendors
Preferred vendors
Answer Description
Prequalified vendors are suppliers who have been assessed and approved in advance based on predefined criteria, ensuring they meet the project's quality and performance standards. This prequalification process streamlines procurement and mitigates risks associated with unvetted suppliers. Preferred vendors might be favored due to past relationships but aren't necessarily pre-assessed for the current project. Certified vendors hold certain certifications but may not have been evaluated against the project's specific needs. Single-source vendors are the only available suppliers for a product or service but may not have been preapproved.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What does it mean to prequalify a vendor?
How are prequalified vendors different from preferred vendors?
Why is it important to use prequalified vendors in a project?
As a project manager at TechNova Inc., you are leading a project to develop a new software application. Midway through the project, a team member suggests adding a feature that could significantly increase customer engagement but might compromise user privacy. Which action should you take to ensure your project aligns with the organization's principles?
Reject the suggestion to avoid risks to user privacy.
Implement the feature to boost customer engagement.
Evaluate the suggestion against the company's values and consult the mission statement before deciding.
Forward the suggestion to the marketing department for approval.
Answer Description
Project managers need to align project decisions with the company's vision, mission, and values. Evaluating the suggestion against the company's values and consulting the mission statement ensures that any new feature aligns with core principles, such as protecting user privacy. Implementing the feature immediately risks violating company values. Forwarding the suggestion to the marketing department shifts responsibility without considering alignment with organizational principles. Rejecting the suggestion without evaluation might overlook a potentially valuable addition that could be modified to meet company standards.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
Why is it important to align project decisions with a company's mission and values?
What steps should a project manager follow when evaluating a suggestion against company values?
How can user privacy concerns be balanced with the goal of increasing customer engagement?
As a project manager overseeing a project with a strict budget, you need to monitor and display the amount of budget consumed versus the amount remaining over time to ensure the project stays within financial constraints. Which tracking chart would be most appropriate for this purpose?
Budget burndown chart
Milestone chart
PERT chart
Gantt chart
Answer Description
The budget burndown chart is the most suitable tool for this purpose as it visually represents the remaining budget over time, allowing the project manager to track actual spending against the planned budget. This helps in identifying trends in budget consumption and making necessary adjustments to stay within budget. A Gantt chart illustrates the project schedule and task durations but does not provide information on budget consumption. A PERT chart is used to estimate project duration when there is uncertainty in task durations, but it does not track project costs. A milestone chart highlights key deliverables and dates but lacks budget tracking capabilities.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is a budget burndown chart?
How does a budget burndown chart differ from an earned value chart?
Why is a Gantt chart not suitable for tracking budget consumption?
During the discovery phase of an IT infrastructure-upgrade project, you learn that the customer already has active contracts for hardware maintenance and software licensing covering some components you intend to replace. Which action should you take to ensure these agreements are properly handled in your project plan?
Defer consideration of the existing contracts until the execution phase to avoid delaying the planning timeline
Conduct a detailed contract analysis with procurement and legal to map obligations, constraints, and dependencies into the project scope, schedule, and risk register
Proceed with planning as usual and assume the project sponsor will address any conflicts that arise from the contracts
Request that procurement terminate the existing contracts and issue new agreements that align with the project's requirements
Answer Description
A detailed review of the contracts-often performed with procurement and legal specialists-reveals any deliverables, service-level commitments, penalties, or cost constraints that must be reflected in the project's scope, schedule, budget, or risk register.
- Deferring the review (incorrect) can cause scope and cost surprises during execution.
- Assuming the sponsor will handle conflicts (incorrect) abdicates the project manager's responsibility for integration management.
- Terminating or replacing the contracts (incorrect) may be impossible, expensive, or outside the project manager's authority.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is a contract analysis in project management?
How does the risk register interact with a contract analysis?
Why is it important to involve legal and procurement during a contract analysis?
A company is launching a new project and has already selected the recipient of the project's deliverables before initiation. What is this scenario called?
Predetermined client
Open procurement
Prequalified vendor
Potential client
Answer Description
This scenario is called having a predetermined client. In project management, a predetermined client means that the client who will receive the project's deliverables is already known before the project starts. This allows the project team to tailor the project objectives and deliverables to the specific needs of that client from the outset. The other options are incorrect: a prequalified vendor is a supplier selected in advance for their ability to deliver goods or services, while a potential client is one who might become a client in the future but has not been confirmed. Open procurement refers to acquiring goods or services through a competitive process without predetermined suppliers or clients.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What is the advantage of having a predetermined client in a project?
How does a predetermined client differ from an open procurement process?
What role does a predetermined client play in stakeholder management?
A project manager is overseeing the construction of a new data center. To align with the company's ESG goals, they must select an action that BEST minimizes the project's long-term environmental impact. Which of the following actions is the MOST effective?
Develop a green space with native plants on the property surrounding the facility.
Source all construction materials from local suppliers to reduce transportation emissions.
Implement a comprehensive recycling program for waste generated during the construction phase.
Design the facility to use renewable energy sources and energy-efficient cooling systems.
Answer Description
Designing the data center to use renewable energy sources and energy-efficient cooling systems is the most effective action. This approach directly addresses operational energy consumption, which is the largest and most continuous source of environmental impact for a data center over its lifecycle. While implementing a construction recycling program, sourcing local materials, and developing a green space are all valuable ESG initiatives, their overall environmental benefit is less significant compared to reducing the facility's long-term energy footprint.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
Why is incorporating renewable energy sources important in project design?
What are some examples of renewable energy sources a manufacturing facility could use?
What are the risks of neglecting environmental considerations in a construction project?
A project manager needs a visual schedule that lists each activity on the vertical axis and places horizontal bars across a calendar-style time scale to indicate when every task starts and finishes. The same chart must also reveal which activities are dependent on others, so the manager can see at a glance which tasks can overlap and which must wait for predecessors to complete. Which type of chart should the project manager create?
Gantt chart
Milestone chart
PERT chart
Budget burndown chart
Answer Description
A Gantt chart displays project tasks against a timeline, showing their start and end dates, durations, and any dependencies between tasks. This makes it ideal for monitoring schedule progress and coordinating resources. Milestone charts focus only on significant events, so they do not convey task durations or dependencies. Budget burndown charts track how quickly funds are consumed over time. PERT charts arrange activities in a network diagram, emphasizing task sequences and durations but without a linear calendar axis.
Ask Bash
Bash is our AI bot, trained to help you pass your exam. AI Generated Content may display inaccurate information, always double-check anything important.
What are dependencies in a Gantt chart?
How is a Gantt chart different from a PERT chart?
Why is a Gantt chart effective for monitoring schedule progress?
Smashing!
Looks like that's it! You can go back and review your answers or click the button below to grade your test.