CompTIA Server+ SK0-005 Practice Question

During a hardware refresh, a systems administrator populates the bottom 10 U and the top 8 U of a 42 U cabinet that sits in a raised-floor cold-aisle/hot-aisle layout. All installed 1 U servers draw air in from the front and exhaust out the rear. Soon after the systems come online, temperature probes on the front of the upper servers report inlet temperatures that are 8 °C higher than those recorded at the bottom of the rack, even though the CRAC supply temperature and airflow are within specification. Which rack-level action will BEST restore proper cooling for the affected servers?

  • Install blanking panels in the empty rack units between the two groups of servers.

  • Increase the CRAC fan speed to raise static pressure in the cold aisle.

  • Replace the perforated rear door of the cabinet with a solid door to keep exhaust air inside the rack.

  • Rotate the top servers so their rear panels face the cold aisle and their fronts face the hot aisle.

CompTIA Server+ SK0-005
Server Hardware Installation and Management
Your Score:
Settings & Objectives
Random Mixed
Questions are selected randomly from all chosen topics, with a preference for those you haven’t seen before. You may see several questions from the same objective or domain in a row.
Rotate by Objective
Questions cycle through each objective or domain in turn, helping you avoid long streaks of questions from the same area. You may see some repeat questions, but the distribution will be more balanced across topics.

Check or uncheck an objective to set which questions you will receive.

SAVE $47
$390.00 $343.00
SAVE $53
CompTIA Server+ Voucher with Retake
v5 / SK0-005
Includes Retake
$439.00 $386.00
Bash, the Crucial Exams Chat Bot
AI Bot