A systems administrator is tasked with installing a new 2U server into a 42U rack. The rack currently has servers filling the bottom 21 units (U1-U21). For optimal weight distribution and airflow, the administrator plans to install the new server with a 1U gap above the existing equipment. The server must be connected to a top-of-rack switch using a 10 GbE link. Which installation plan is BEST?

  • Install the server in units U41-U42 and use a QSFP+ transceiver for the network connection.

  • Install the server in units U22-U23 and use an SFP+ transceiver for the network connection.

  • Install the server in units U23-U24 and use an LC-to-SC single-mode fiber patch cable.

  • Install the server in units U23-U24 and use an SFP+ transceiver for the network connection.

CompTIA Server+ SK0-005
Server Hardware Installation and Management
Your Score:
Settings & Objectives
Random Mixed
Questions are selected randomly from all chosen topics, with a preference for those you haven’t seen before. You may see several questions from the same objective or domain in a row.
Rotate by Objective
Questions cycle through each objective or domain in turn, helping you avoid long streaks of questions from the same area. You may see some repeat questions, but the distribution will be more balanced across topics.

Check or uncheck an objective to set which questions you will receive.

SAVE $47
$390.00 $343.00
SAVE $53
CompTIA Server+ Voucher with Retake
v5 / SK0-005
Includes Retake
$439.00 $386.00
Bash, the Crucial Exams Chat Bot
AI Bot